[edit] Aim and benefits
To recognise and encourage measures to optimise material efficiency in order to minimise environmental impact of material use and waste.
[edit] When to consider
At the preparation and Brief Stage, RIBA Stage 1. The credit requires decisions and actions taken at this stage to be documented for evidence. An updated or revised document should then be recorded at each key stage.
[edit] Step by step guidance
Identify opportunities to optimise the use of materials in the building design, procurement, construction, maintenance and end of life. Investigate and implement appropriate measures in line with these.
This needs to be carried out at each of the following RIBA Stages:
· Stage 1 - Preparation and Brief
· Stage 2 – Concept Design
· Stage 3 – Developed Design
· Stage 4 – Technical Design
· Stage 5 – Construction
Opportunities could include using fewer materials, reusing demolition or strip out materials and using materials with a higher recycled content. They could also include utilising off site prefabrication.
[edit] Questions to ask while seeking compliance
Has this been started at RIBA Stage 1? Whilst this may not be in the same format as later stages there does need to be something recorded on materials considerations at this stage otherwise the credit shall not be achievable.
[edit] Tools and resources
WRAP Designing out Waste: A design team guide for Buildings
BS 8895 Designing for material efficiency in building projects
[edit] Tips and best practice
Awaiting content
[edit] Typical evidence
Usually a table of considerations made at each stage, perhaps against work packages, combined with a brief report from the relevant responsible party to describe the work undertaken in this area during each stage. Provide meeting minutes, drawings, specifications etc. if referenced to show how the work has influenced the designs.
[edit] Applicable Schemes
The guidelines collated in this ISD aim to support sustainable best practice in the topic described. This issue may apply in multiple BREEAM schemes covering different stages in the life of a building, different building types and different year versions. Some content may be generic but scheme nuances should also be taken into account. Refer to the comments below and related articles to this one to understand these nuances. See this document for further guidelines.
- List applicable schemes here
BRE Global does not endorse any of the content posted and use of the content will not guarantee the meeting of certification criteria.
Featured articles and news
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.